Skip to content

THE VELNUZ SPORTS RESOURCE LIBRARY

Good spaces start
with good information.

Court dimensions. Safer training. Better planning.
A practical reference library for the people behind the venue.

Explore the library
THE DETAILS MATTER01 / PADEL
20 m10 mINTERNAL PLAYING AREA

Dimensions are a starting point.
The full specification completes the picture.

FIP 2026 · simplified reference, not for construction

FIND WHAT YOUR PROJECT NEEDS

Explore the knowledge library.

32 resources across six topics

Squash courtsOfficial guidance

Squash court dimensions & clear height

A starting reference for singles-court space planning.

Sport England / WSF reference route

2011 dimensional reference · current WSF edition to be confirmed

Read overview
  • Singles playing space: 9.75 × 6.40 m; reference clear height: 5.64 m.
  • These dimensions are cross-checked against Sport England’s April 2011 reference, not a newly issued WSF document. Confirm current WSF specifications and event requirements before design approval.
  • Allow separately for wall construction, structure, viewing, circulation and services.

Editorial review: 18 September 2026

Link to this resource
Squash courtsOfficial rules

WSF court specifications: where to start

Find the governing-body route for court construction requirements.

WSF / US Squash

Official reference route · access limitation noted

Read overview
  • US Squash directs readers to WSF court specifications for the international game.
  • Use the complete specification for tolerances, markings, playing surfaces and court interfaces. A supplier’s drawing or product label is not a substitute.
  • The WSF site restricted automated access during our review. The official route was cross-checked through US Squash; confirm the current document directly before procurement.

Editorial review: 18 September 2026

Link to this resource
Squash courtsOfficial rules

Singles rules, interference & safe play

Read the official playing rules alongside your venue plans.

World Squash Officiating

Singles rules · September 2025

Read overview
  • WSO publishes the September 2025 World Squash singles rules.
  • Safety comes first. The rules address interference, turning and dangerous play; coaches and players should use the full text rather than a short venue summary.

Editorial review: 18 September 2026

Link to this resource
Squash courtsOfficial rules

Protective eyewear for squash

A useful reference for junior programmes and doubles sessions.

WSO / WSF

Rules appendix 4 · September 2025

Read overview
  • WSF recommends suitable protective eyewear during play and warm-up.
  • It is mandatory in WSF-sanctioned junior and doubles events. Check the applicable event rules and accepted eyewear standards; ordinary spectacles are not a verified substitute.

Editorial review: 18 September 2026

Link to this resource
Squash courtsVELNUZ guide

Planning a move to an all-glass squash court

Assess the complete court system, not just its appearance.

VELNUZ editorial

Planning guide · project-specific

Read overview
  • VELNUZ supplies all-glass squash courts. For a venue with existing plaster or panel walls, review the site, interfaces and replacement scope before proposing a conversion.
  • Ask for the proposed assembly, relevant product evidence and care instructions. No material is universally the best or maintenance-free.
  • Separate a proposed system from any specific certification claim.

Editorial review: 18 September 2026

Link to this resource
Squash courtsVELNUZ guide

Existing-court renovation checklist

What to gather before discussing a court upgrade.

VELNUZ editorial

Site review guide

Read overview
  • Photograph walls, floor, doors, damage and access routes; collect measured drawings and the existing system details.
  • Identify what should remain, what needs review and your preferred closure window.
  • Have compatibility and building interfaces reviewed before replacing glass, floor or lighting.

Editorial review: 18 September 2026

Link to this resource
Padel courtsOfficial rules

Padel court dimensions & service lines

The essential playing-area measurements.

International Padel Federation

Rules effective 1 January 2026 · p. 4

Read overview
  • Internal court: 20 × 10 m. Service lines: 6.95 m from the net; line width: 5 cm.
  • See the full document for tolerances.

Editorial review: 18 September 2026

Link to this resource
Padel courtsOfficial rules

Padel clear height & obstructions

Check the lowest obstruction, not the average roof height.

International Padel Federation

Rules effective 1 January 2026 · p. 4

Read overview
  • Minimum unobstructed height: 6 m throughout; 8 m is suggested for new facilities.

Editorial review: 18 September 2026

Link to this resource
Padel courtsOfficial rules

Padel net height

Centre and end measurements are different.

International Padel Federation

Rules effective 1 January 2026 · p. 5

Read overview
  • Net height: 0.88 m at the centre, rising to 0.92 m at the ends. Refer to FIP for tolerance and assembly requirements.

Editorial review: 18 September 2026

Link to this resource
Padel courtsOfficial rules

Enclosures, access & out-of-court play

A court footprint is not the full safety layout.

International Padel Federation

Rules effective 1 January 2026 · pp. 6–8

Read overview
  • End enclosure: 4 m overall, comprising 3 m wall and 1 m mesh.
  • Access and out-of-court play have additional requirements. Review the diagrams before fixing the site layout.

Editorial review: 18 September 2026

Link to this resource
Padel courtsOfficial rules

Padel lighting & outdoor orientation

Start with the playing rules, then commission a site-specific design.

International Padel Federation

Rules effective 1 January 2026 · p. 8

Read overview
  • FIP calls for uniform light without visual difficulty. Pole positions and clear height matter.
  • Outdoor longitudinal orientation is recommended north–south, with the stated permitted variation.

Editorial review: 18 September 2026

Link to this resource
Padel courtsVELNUZ guide

Foundations, drainage & installation readiness

Prepare the venue before the equipment arrives.

VELNUZ editorial

Installation planning guide

Read overview
  • Assign foundation, drainage, electrical and structural review to the responsible local designers.
  • Confirm handling equipment, storage space, competent installers and the agreed supervision scope.
  • Court rules alone do not establish foundation loads, wind resistance or local approval.

Editorial review: 18 September 2026

Link to this resource
Fitness equipmentOfficial guidance

ISO 20957: stationary equipment safety

Understand the standard’s scope before requesting evidence.

International Organization for Standardization

ISO 20957-1:2024 · official abstract

Read overview
  • ISO 20957-1:2024 covers general safety requirements and test methods for indoor stationary training equipment.
  • Equipment-specific parts may take precedence. The standard excludes outdoor equipment and most under-14 use, subject to its stated supervised educational exception.
  • The official abstract is free; the complete standard is a paid publication. A reference to ISO is not proof of product certification.

Editorial review: 18 September 2026

Link to this resource
Fitness equipmentVELNUZ guide

Gym spacing: footprint is only the beginning

Plan for users, moving parts and circulation.

VELNUZ editorial

Equipment layout guide

Read overview
  • Collect each selected model’s footprint and operating envelope, including loading and adjustment areas.
  • Keep circulation separate from active movement and reserve maintenance access.
  • Do not apply a single clearance number to every machine; follow the model instructions and local design.

Editorial review: 18 September 2026

Link to this resource
Fitness equipmentVELNUZ guide

Strength machines: selection & adjustment

Compare selectorised and plate-loaded equipment for the intended users.

VELNUZ editorial

Product selection guide

Read overview
  • Review adjustment ranges, intended use, load limits and movement coverage.
  • Confirm plate compatibility, storage and accessible service parts.
  • Before use, operators should provide equipment-specific instruction from the supplied manual.

Editorial review: 18 September 2026

Link to this resource
Fitness equipmentVELNUZ guide

Cardio equipment: power, access & support

Make electrical and service needs part of the purchase brief.

VELNUZ editorial

Model-specific planning checklist

Read overview
  • Specify voltage, frequency, operating setting and available service support.
  • Confirm controls, emergency-stop arrangements and clearances using the exact model manual.
  • Local electrical work and protection must be reviewed by the appointed competent team.

Editorial review: 18 September 2026

Link to this resource
Fitness equipmentVELNUZ guide

Free weights & storage planning

Give every item a return point outside active lifting areas.

VELNUZ editorial

Storage planning guide

Read overview
  • Match racks and holders to their intended weights, dimensions and rated capacities.
  • Keep equipment returns and carrying routes clear of active exercise zones.
  • Confirm assembly and anchoring requirements from the selected rack instructions.

Editorial review: 18 September 2026

Link to this resource
Fitness equipmentVELNUZ guide

Functional training: lanes, throws & transitions

Organise sessions without crossing active training paths.

VELNUZ editorial

Functional training guide

Read overview
  • Separate sled and carry lanes, wall-ball throwing zones, machine positions and waiting areas.
  • Check rig fixings and height against the selected equipment and building structure.
  • Programme capacity depends on simultaneous stations and supervision, not floor area alone.

Editorial review: 18 September 2026

Link to this resource
Safety & operationOfficial guidance

Build a venue risk assessment

A practical structure for identifying and managing hazards.

UK Health and Safety Executive

UK workplace guidance · not a global legal rule

Read overview
  • Identify hazards, assess who could be harmed, select controls, record actions and review them.
  • Include normal use, cleaning, maintenance, visitors and changes to the layout.
  • HSE guidance is UK-based. Apply the requirements of your own jurisdiction with competent local advice.

Editorial review: 18 September 2026

Link to this resource
Safety & operationOfficial guidance

Equipment checks & inspection records

Use a risk-based inspection plan, not an invented universal interval.

UK Health and Safety Executive

UK equipment inspection guidance

Read overview
  • HSE distinguishes simple pre-use checks from more detailed inspections where deterioration can create danger.
  • Set the scope and frequency using risk, use conditions and manufacturer guidance; keep appropriate records.
  • UK work-equipment guidance: confirm local applicability.

Editorial review: 18 September 2026

Link to this resource
Safety & operationOfficial guidance

Cleaning, spills & slip prevention

Wet cleaning can introduce a hazard as well as remove one.

UK Health and Safety Executive

Cleaning safety guidance

Read overview
  • Choose cleaning methods suitable for the floor and contamination. Manage access until the area is safe.
  • A warning sign alone does not stop someone entering a wet area. Report damaged surfaces and control trip hazards.
  • UK HSE guidance; follow the surface supplier’s care instructions.

Editorial review: 18 September 2026

Link to this resource
Safety & operationOfficial guidance

RowErg maintenance: a manufacturer example

See how a real model-specific maintenance schedule is organised.

Concept2

RowErg manufacturer maintenance guide

Read overview
  • Concept2 separates daily care, 50-hour tasks and 250-hour tasks, with institutional-use intervals also stated.
  • Use its current instructions for the exact model, lubricants and replacement criteria; do not transfer this schedule to unrelated equipment.
  • This reference does not imply VELNUZ is a Concept2 distributor.

Editorial review: 18 September 2026

Link to this resource
Safety & operationVELNUZ guide

Before opening: an operator’s briefing checklist

Turn equipment instructions into clear everyday routines.

VELNUZ editorial

General operator checklist

Read overview
  • Identify who checks the floor, who provides user induction and who can take equipment out of service.
  • Keep manuals and emergency procedures accessible; show users where to report faults.
  • Isolate suspected unsafe equipment pending competent assessment. This checklist does not replace training, a venue risk assessment or manufacturer instructions.

Editorial review: 18 September 2026

Link to this resource
Venue planningOfficial guidance

Accessible & inclusive sports facilities

Consider the whole visitor journey, not only the playing area.

Sport England

Accessible and inclusive sports facilities · current portal

Read overview
  • Sport England’s guidance covers arrival, internal spaces, changing facilities, wayfinding, evacuation and management.
  • Use the relevant sections with your design team and local accessibility requirements. This is England-focused guidance, not a worldwide building code.

Editorial review: 18 September 2026

Link to this resource
Venue planningVELNUZ guide

Site survey: the information designers need

Make the existing building and delivery route visible.

VELNUZ editorial

Site planning checklist

Read overview
  • Record clear dimensions, columns, lowest obstructions, utilities and doors.
  • Document unloading space and movement from the delivery vehicle to the final position.
  • Label unknowns instead of assuming the site is ready.

Editorial review: 18 September 2026

Link to this resource
Venue planningVELNUZ guide

Compare quotations on the same scope

Separate equipment, transport, local works and optional support.

VELNUZ editorial

Procurement comparison guide

Read overview
  • Match drawings, quantities, finishes, evidence and spare parts across proposals.
  • Identify trade terms, named delivery points, exclusions and the currency used.
  • A factory price and a delivered-and-installed total are not comparable without adjusting their scope.

Editorial review: 18 September 2026

Link to this resource
Venue planningVELNUZ guide

The handover file: drawings, care & spares

Keep the operator’s information connected to the equipment supplied.

VELNUZ editorial

Handover planning guide

Read overview
  • Request final relevant drawings, component identification and assembly information.
  • Keep care instructions, part references, agreed warranty terms and reporting channels together.
  • Reconcile the packing list and arrival condition with the supplied item schedule.

Editorial review: 18 September 2026

Link to this resource
Venue planningVELNUZ guide

Who handles design, supply & installation?

Agree the boundaries before the order is released.

VELNUZ editorial

Project responsibility guide

Read overview
  • Assign equipment scope, local engineering, foundations, utilities and site work separately.
  • If supervision is included, define attendance, checks and reporting in writing.
  • Equipment guidance does not transfer responsibility for local approvals, labour or site safety.

Editorial review: 18 September 2026

Link to this resource
Templates & downloadsDownload template

Project brief template

Organise the first conversation about a venue or equipment order.

VELNUZ editorial

Editable planning template

Read overview
  • Country, project stage, equipment lines and quantities.
  • Drawings, budget, timing and the support you need.
  • Editable TXT · a planning aid, not a certificate or engineering approval.

Editorial review: 18 September 2026

Link to this resource
Templates & downloadsDownload template

Site measurement checklist

Record the dimensions and access information your team needs.

VELNUZ editorial

Editable planning template

Read overview
  • Room dimensions, clear height, obstacles and services.
  • Access route, photographs and unresolved site questions.
  • Editable TXT · a planning aid, not a certificate or engineering approval.

Editorial review: 18 September 2026

Link to this resource
Templates & downloadsDownload template

Quotation comparison sheet

Compare inclusions rather than headline prices.

VELNUZ editorial

Editable planning template

Read overview
  • Equipment, inspection, freight and local works.
  • Exclusions, trade terms and outstanding assumptions.
  • Editable TXT · a planning aid, not a certificate or engineering approval.

Editorial review: 18 September 2026

Link to this resource
Templates & downloadsDownload template

Inspection document index

Keep order evidence in a usable sequence.

VELNUZ editorial

Editable planning template

Read overview
  • Item identity, approved drawings and relevant reports.
  • Inspection results, deviations, packing and release records.
  • Editable TXT · a planning aid, not a certificate or engineering approval.

Editorial review: 18 September 2026

Link to this resource

SOURCES, NOT SHORTCUTS

A useful reference.
Not a substitute for review.

This library brings together official publications and VELNUZ planning notes. Publisher names identify sources, not partnerships, endorsements or product certification.

Rules, editions and local requirements can change. Read the full source and confirm the applicable edition before design, procurement or operation. UK guidance is labelled by jurisdiction; manufacturer guidance applies to the named model.

WSF’s court-construction site restricted automated access during this review. Its official route is included alongside federation and dimensional references; current specification details still need direct confirmation. ISO links provide public abstracts; full standards may require purchase.

Editorial review: 18 September 2026 · Updates are manually curated, not a live standards feed.

FROM REFERENCE TO REAL PROJECT

Have the information.
Need help with the next step?

Discuss your project