Court equipment
Glass, base, flooring, hardware, markings, tin and the selected lighting package. Confirm finishes and quantities against the drawings.
VELNUZ SPORTS / CONFIGURATION & QUOTATION
A transparent starting point for your all-glass squash court package. Separate the equipment, project options and site services before comparing quotations.
REFERENCE MATERIAL SCHEDULE
The following describes a reference relocatable package. Final factory configuration, quantities and electrical requirements are confirmed in your project quotation.
8 mm steel base, supplied in 11 sections.
Reference playing area: 62.4 m². 22 mm maple surface, 40 × 50 mm LVL battens, 12 mm plywood and 18 mm resilient pads.
12 mm low-iron tempered glass with ceramic screen printing. Colour selected to the project brief.
Upper and lower glass support assemblies, coordinated with the wall layout and connection drawings.
12 mm low-iron tempered glass, rear-wall panels, glass door and support fins.
Aluminium mounting components, stainless-steel fixings, sleeves and squash door hardware.
Court boundary tapes, with colour agreed against the glass and floor finishes.
6,400 mm aluminium sound board; reference settings of 480 mm and 430 mm.
Reference schedule: 17 anti-glare LED luminaires, 200 W each, 220 V, with mounting supports. Final layout and electrical compatibility require project review.
COMPARE LIKE FOR LIKE
Glass, base, flooring, hardware, markings, tin and the selected lighting package. Confirm finishes and quantities against the drawings.
Packing, origin handling, freight, destination charges and delivery to site. The quotation identifies the agreed trade term and responsibility split.
Civil works, utilities, local labour, lifting, installation support, taxes and approvals. Included and excluded items should be explicit.
OPTIONS, NOT ASSUMPTIONS
Glass colour, floor finish, line colour and approved branding positions.
Supply-only, guidance or supervision, with local site responsibilities defined.
An agreed spare-parts list, replacement references and maintenance documentation.
A FEW USEFUL ANSWERS
No. This is a configuration reference, not a final offer. Court quantity, finishes, site conditions, destination and service scope all affect the quotation.
The reference schedule lists 220 V luminaires. The final equipment must be checked against local voltage, frequency, electrical rules and required product documentation.
WSF court specifications guide the court package. The agreed drawings and material schedule set out the dimensions, components, installation requirements and acceptance checks for your project.
LET’S PLAN YOUR COURT
Send your country, city, court quantity and any available floor plan.
We will help you define the equipment and delivery scope.