01 · Site review
Share drawings, current photographs, clear dimensions, access restrictions and the proposed use of the venue.
VELNUZ SPORTS · PLANNING & RENOVATION
Start with the building and the operator’s requirements. A clear scope connects court design, existing-site conditions, material supply and the installation handover.
THE PROJECT SCOPE
Share drawings, current photographs, clear dimensions, access restrictions and the proposed use of the venue.
Agree the court format, materials, building interfaces and the division of responsibilities.
Confirm the component schedule, inspection points, export packing and delivery requirements.
Coordinate installation information, unloading access, checks and the maintenance documents included in the contract.
DESIGNED AS A SYSTEM
For a new venue, align the court package with the building design. For an upgrade, establish what can remain, what needs replacement and how the work affects daily operations. Replacement glass, flooring and lighting must suit the existing system.
DISCUSS YOUR REQUIREMENTSSCOPE BEFORE SUPPLY
| Planning topic | Information to share | Scope decision |
|---|---|---|
| Building & structure | Plans, clear dimensions, supports and substrate condition | Fit and structural interfaces for local engineering review |
| Access & logistics | Doorways, lifting access, unloading area and storage space | Packing, handling and delivery sequence |
| Existing court | Photos, dimensions, damage, current materials and system details | Retain, repair or replace each component |
| Indoor environment | Ventilation, humidity, condensation risks and operating hours | Building-services interfaces and material suitability |
| Programme & responsibilities | Target opening, closure window and available local team | Supply, local works, installation and acceptance responsibilities |
The final quotation and approved specification define the supplied package and responsibilities.
BEFORE YOU ENQUIRE
Send the venue location, drawings if available, clear photographs of the court and any defects, the changes you want and your preferred work window.
No — installation is quoted separately from supply, and is normally carried out by a local team. VELNUZ supplies the equipment, the installation drawings and the handover documents, and can arrange supervision on request. Supply, supervision, on-site labour, lifting, building work and commissioning are always listed as separate lines in the contract.
The programme is established after scope, production, transport and site readiness are reviewed. Share your target date early so the practical requirements can be discussed.
VELNUZ SPORTS
Share your location, drawings and intended use.