Flooring
Agree the playing surface, subfloor, finish, line markings and cleaning method. Review moisture conditions and floor transitions with the building team.
VELNUZ SPORTS · COMPONENTS
Bring flooring, lighting, the tin and court fittings into one specification. Each item is selected around the court system, the playing environment and future maintenance.
THE PROJECT SCOPE
Agree the playing surface, subfloor, finish, line markings and cleaning method. Review moisture conditions and floor transitions with the building team.
Define visibility, glare control, mounting positions and maintenance access. Confirm the lighting design against the venue’s intended use.
One tin covers both formats: adjustable between 430 mm for professional play and 480 mm for club through national-standard play. State the competition formats the venue will host, and include the adjustment method, fixing arrangement and replacement parts in the scope.
Specify compatible brackets, hinges, handles, fasteners and finishes. Agree the material grade and a practical spare-parts list.
DESIGNED AS A SYSTEM
A component list should explain how the parts work together. Keep the flooring interface, glass fixing positions and lighting access coordinated so the site team can install and maintain the agreed system.
DISCUSS YOUR REQUIREMENTSSCOPE BEFORE SUPPLY
| Component | Specification fields | Documents to request |
|---|---|---|
| Sports flooring | Surface, thickness, subfloor, moisture preparation, markings and care | Material data, installation guidance and applicable test reports |
| LED lighting | Target illuminance, uniformity, glare, power, mounting and controls | Lighting calculation, layout and luminaire data |
| Adjustable tin | Required height settings, adjustment method and impact-facing surface | Assembly detail, adjustment instructions and parts list |
| Aluminium fittings | Alloy grade, temper, finish, geometry and glass compatibility | Material specification and fixing details |
| Fasteners & spares | Material, size, finish, quantity and replacement identification | Hardware schedule and spare-parts list |
The final quotation and approved specification define the supplied package and responsibilities.
BEFORE YOU ENQUIRE
No. The fixture count and light output depend on the room, mounting arrangement and intended use. They are confirmed in the project lighting design.
A replacement enquiry needs the existing system details, dimensions and photographs. Suitability is confirmed before the component is included in a quotation.
The quotation and approved specification identify the selected materials and performance requirements. Supporting documents are reviewed for the exact components proposed.
VELNUZ SPORTS
Share your location, drawings and intended use.